docs: Add Doc review process doc
Create a new document that outlines the document review process. Fixes #40. Signed-off-by: James O. D. Hunt <james.o.hunt@intel.com>
This commit is contained in:
parent
fafc7a700a
commit
1a0f388c36
@ -250,6 +250,9 @@ line**:
|
|||||||
- +1
|
- +1
|
||||||
- Approve
|
- Approve
|
||||||
|
|
||||||
|
Documentation PRs can sometimes use a modified process explained in the
|
||||||
|
[Documentation Review Process](Documentation-Review-Process.md) guide.
|
||||||
|
|
||||||
### Examples
|
### Examples
|
||||||
|
|
||||||
The following is an example of a valid "ack":
|
The following is an example of a valid "ack":
|
||||||
|
164
Documentation-Review-Process.md
Normal file
164
Documentation-Review-Process.md
Normal file
@ -0,0 +1,164 @@
|
|||||||
|
# Documentation review process
|
||||||
|
|
||||||
|
* [Introduction](#introduction)
|
||||||
|
* [The Documentation Team](#the-documentation-team)
|
||||||
|
* [Default document review process](#default-document-review-process)
|
||||||
|
* [Justification for different process](#justification-for-different-process)
|
||||||
|
* [Users should always expect accurate Documentation](#users-should-always-expect-accurate-documentation)
|
||||||
|
* [Some documentation PRs can be fast-tracked](#some-documentation-prs-can-be-fast-tracked)
|
||||||
|
* [Formal doc reviews can be very time-intensive](#formal-doc-reviews-can-be-very-time-intensive)
|
||||||
|
* [Decision Authority](#decision-authority)
|
||||||
|
* [Determine if a full document review is required](#determine-if-a-full-document-review-is-required)
|
||||||
|
* [Exempt](#exempt)
|
||||||
|
* [Required](#required)
|
||||||
|
* [Requesting a formal document review](#requesting-a-formal-document-review)
|
||||||
|
* [Lightweight document review process](#lightweight-document-review-process)
|
||||||
|
|
||||||
|
## Introduction
|
||||||
|
|
||||||
|
The process for reviewing documentation PRs is slightly different from
|
||||||
|
[the general process for reviewing code PRs](https://github.com/kata-containers/community/blob/master/CONTRIBUTING.md#reviewsPR-Review-Guide.md).
|
||||||
|
This document explains the differences.
|
||||||
|
|
||||||
|
## The Documentation Team
|
||||||
|
|
||||||
|
The Documentation Team is responsible for carrying out a full documentation
|
||||||
|
review of a PRs containing documentation changes. Such a review includes
|
||||||
|
checking the grammar, structure, consistency, and typographical correctness of
|
||||||
|
the documentation changes.
|
||||||
|
|
||||||
|
The following GitHub team lists the users who are members of the Documentation Team:
|
||||||
|
|
||||||
|
- https://github.com/orgs/kata-containers/teams/documentation/members
|
||||||
|
|
||||||
|
## Default document review process
|
||||||
|
|
||||||
|
[Project maintainers](https://github.com/kata-containers/community/blob/master/CONTRIBUTING.md#project-maintainers)
|
||||||
|
have the power to approve or reject PRs using the pullapprove tool employed by
|
||||||
|
all repositories.
|
||||||
|
|
||||||
|
If a Documentation Team review is required, the pullapprove configuration will
|
||||||
|
apply and the PR will be blocked until the required number of acks are
|
||||||
|
obtained for the documentation changes.
|
||||||
|
|
||||||
|
Technical writers from the Documentation Team will review the document
|
||||||
|
changes and add comments explaining how the wording should be changed. It is
|
||||||
|
then up to the PR creator to apply these changes to their original PR,
|
||||||
|
rebasing as necessary to ensure a clean `git(1)` history. Once the creator has
|
||||||
|
applied the changes they need to re-push their branch and add a comment to the
|
||||||
|
PR asking for a re-review. This process continues indefinitely until the the
|
||||||
|
Documentation Team is happy with the final result.
|
||||||
|
|
||||||
|
## Justification for different process
|
||||||
|
|
||||||
|
The documentation review process is different than the code review process for
|
||||||
|
the following reasons:
|
||||||
|
|
||||||
|
### Users should always expect accurate Documentation
|
||||||
|
|
||||||
|
Just like code changes, some documentation changes have to be merged as soon
|
||||||
|
as possible to ensure users have current and accurate information.
|
||||||
|
|
||||||
|
Documentation changes tend to be more urgent though. For example, a "Priority
|
||||||
|
1" code issue needs to be fixed quickly. However it would also need to be
|
||||||
|
documented clearly (and quickly). If the P1 issue *cannot* be fixed quickly,
|
||||||
|
the documentation must still be updated as soon as possible to alert users of
|
||||||
|
the issue and to provide suitable workarounds.
|
||||||
|
|
||||||
|
If the documentation is *not* kept current, users have incorrect information
|
||||||
|
and might create problems for themselves or become disaffected with the
|
||||||
|
project entirely.
|
||||||
|
|
||||||
|
In summary, do not let documentation PRs sit in the PR backlog for any longer
|
||||||
|
than necessary.
|
||||||
|
|
||||||
|
### Some documentation PRs can be fast-tracked
|
||||||
|
|
||||||
|
If a PR makes a minor change to one or more documents, passing to the
|
||||||
|
Documentation Team for a formal review and approval might not be necessary.
|
||||||
|
|
||||||
|
### Formal doc reviews can be very time-intensive
|
||||||
|
|
||||||
|
Since a full document review can be a slow and pain-staking process, and since
|
||||||
|
the number of professional technical writers on the Documentation Team is
|
||||||
|
relatively small compared to the number of developers, it makes sense to only
|
||||||
|
perform such reviews on the documents that justify the effort.
|
||||||
|
|
||||||
|
## Decision Authority
|
||||||
|
|
||||||
|
If a Documentation Team member believes a full review is required, their
|
||||||
|
decision is final.
|
||||||
|
|
||||||
|
In most other cases, a project maintainer will decide whether a full review is
|
||||||
|
required or not.
|
||||||
|
|
||||||
|
If project maintainers cannot decide whether the lightweight process should be
|
||||||
|
followed, the full process should be used instead since the uncertainty
|
||||||
|
implies "more eyes" should see the changes.
|
||||||
|
|
||||||
|
## Determine if a full document review is required
|
||||||
|
|
||||||
|
### Exempt
|
||||||
|
|
||||||
|
If a PR contains documentation changes that **only** relate to one or more of
|
||||||
|
the following categories, it does not need to be formally reviewed and
|
||||||
|
approved by the Documentation Team:
|
||||||
|
|
||||||
|
- Changes to code blocks
|
||||||
|
|
||||||
|
The PR only modifies code blocks embedded in the document.
|
||||||
|
|
||||||
|
- "Typo" fixes
|
||||||
|
|
||||||
|
The PR only fixes spelling mistakes and whitespace issues.
|
||||||
|
|
||||||
|
- Formatting
|
||||||
|
|
||||||
|
The PR only modifies the layout of the existing text. For example, you
|
||||||
|
update words to render them in a ``fixed font`` or change a
|
||||||
|
[Note](https://github.com/kata-containers/documentation/blob/master/Documentation-Requirements.md#notes)
|
||||||
|
to fit the standard formatting conventions.
|
||||||
|
|
||||||
|
- URL fixes
|
||||||
|
|
||||||
|
The PR only modifies URLs or updates the table of contents.
|
||||||
|
|
||||||
|
- The PR only *removes* documentation.
|
||||||
|
|
||||||
|
### Required
|
||||||
|
|
||||||
|
The following PR changes generally indicate a full document review is
|
||||||
|
necessary:
|
||||||
|
|
||||||
|
- A new document has been added by the PR.
|
||||||
|
|
||||||
|
All documents should have an initial review unless they are extremely simple.
|
||||||
|
|
||||||
|
## Requesting a formal document review
|
||||||
|
|
||||||
|
If a PR needs a full document review, add a comment to the PR like the
|
||||||
|
following, which sends a mail to all members of the Documentation Team:
|
||||||
|
|
||||||
|
```
|
||||||
|
PTAL @kata-containers/documentation
|
||||||
|
```
|
||||||
|
|
||||||
|
## Lightweight document review process
|
||||||
|
|
||||||
|
1. Obtain general agreement that
|
||||||
|
a Document Team review [is not required](#decision-authority).
|
||||||
|
|
||||||
|
1. Ensure all other approvals and CI checks have been met.
|
||||||
|
|
||||||
|
1. Ensure the PR contains a note explaining why the PR does not justify a full review.
|
||||||
|
|
||||||
|
1. Request a project maintainer force-merges the PR.
|
||||||
|
|
||||||
|
This operation bypasses the pullapprove check that normally stops a PR from
|
||||||
|
landing until the Documentation Team ack the PR.
|
||||||
|
|
||||||
|
1. The maintainer should notify the Documentation Team out of courtesy that
|
||||||
|
the PR has been merged.
|
||||||
|
|
||||||
|
This allows a follow-on "recovery PR" to be raised should the Documentation
|
||||||
|
Team disagree on using the lightweight process.
|