From 9024874e47bc16edd327a2aa29a13df9fa394a6e Mon Sep 17 00:00:00 2001 From: Isaac Hollander McCreery Date: Thu, 8 Oct 2015 16:57:05 -0700 Subject: [PATCH] Proposed versioning changes --- docs/design/versioning.md | 6 +++--- 1 file changed, 3 insertions(+), 3 deletions(-) diff --git a/docs/design/versioning.md b/docs/design/versioning.md index ede6b450e3c..c764a585a6b 100644 --- a/docs/design/versioning.md +++ b/docs/design/versioning.md @@ -44,9 +44,9 @@ Legend: * Kube 1.0.0, 1.0.1 -- DONE! * Kube 1.0.X (X>1): Standard operating procedure. We patch the release-1.0 branch as needed and increment the patch number. -* Kube 1.1.0-alpha.X: Released roughly every two weeks by cutting from HEAD. No cherrypick releases. If there is a critical bugfix, a new release from HEAD can be created ahead of schedule. (This applies to the beta releases as well.) -* Kube 1.1.0-beta.X: When HEAD is feature-complete, we go into code freeze 2 weeks prior to the desired 1.1.0 date and only merge PRs essential to 1.1. Releases continue to be cut from HEAD until we're essentially done. -* Kube 1.1.0: Final release. Should occur between 3 and 4 months after 1.0. +* Kube 1.1.0-alpha.X: Released roughly every two weeks by cutting from HEAD. No cherrypick releases. If there is a critical bugfix, a new release from HEAD can be created ahead of schedule. +* Kube 1.1.0-beta: When HEAD is feature-complete, we will cut the release-1.1.0 branch 2 weeks prior to the desired 1.1.0 date and only merge PRs essential to 1.1. This cut will be marked as 1.1.0-beta, and HEAD will be revved to 1.2.0-alpha.0. +* Kube 1.1.0: Final release, cut from the release-1.1.0 branch cut two weeks prior. Should occur between 3 and 4 months after 1.0. 1.1.1-beta will be tagged at the same time on the same branch. ### Major version timeline